Tuesday, October 27, 2009

Big change today


I've decided that since my stone is now cut down to a weight that I can hope to move, and since I'm really tired of waiting for the rain to stop, I'm moving inside. However, since I'll be needing my pneumatic hammer/chisels, I needed to route the airline out of
the garage and into the house. I decided to use 1-1/2" PVC tubing for this and it went together without incident. The hose is routed through the PVC into the house, over to my indoor stone studio and drops down from the ceiling. I know that I can get the marble piece downstairs, and I'm hoping to get someone over to help me lift it up onto the carving bench. Looks like I'm not going to be carving in the snow!

No comments:

Post a Comment